Skip to page content
Return to Top

Stephenville Campus Construction Update

Science Building Signage Installation

SSC – Tarleton is overseeing the installation of new signage for the Science Building.  Portions of Lillian street at Vanderbilt street will be blocked throughout today. Scaffolding will be raised up the south side of the building. The entrance near the Planetarium and Fain Auditorium will be temporarily closed. However, all other entrances into the Science Building will remain open.

An attached map of the area shows the construction area.

As always, please follow posted directions. Your cooperation is most appreciated.