CM-3(2): Testing, Validation and Documentation of Changes
TAMUS Required By: 08/01/2022
Review Date: 06/26/2024
- Information resource owners or their designee are responsible for determining the types of changes that are configuration-controlled as specified in Control CM-3, Configuration Change Control.
- Configuration-controlled changes to Moderate Impact Information Resources should be tested, validated, and documented before finalizing their implementation.
- Configuration-controlled changes to High Impact Information Resources must be tested, validated, and documented before finalizing their implementation.
References/Additional Resources
None. See any applicable internal procedures.